About us
Inspections/Services
Sample reports &
Document downloads

Fee schedule
Schedule an appointment
Home

Large multi-family buildings have major concerns w/ roofing, exterior masonry, windows, lead paint, egress porches, & general habitability standards.  The City actively reviews large building exterior masonry, & holds building owner accountable for maintaining it.  Given the age of most of these buildings, the masonry always has concerns; concerns that can be quite expensive to correct.  Often, deteriorated masonry coexists w/ deteriorated roofing; leaking roofs are one of the most common causes of damaged masonry.  Given the size of these buildings, the cost of masonry repair & roof replacement can be staggering.  Windows alone can be both a source of excessive energy waste & liability due to lead paint contamination.  Egress porches are often dilapidated & require major renovation, @ substantial cost.  Heating, plumbing, & electrical systems can be outdated, in addition to interior finishes requiring major renovation.  Section 8 buildings have standards that must be met if the building is to maintain its acceptance within those programs.  Large multi-family buildings require detailed analysis of all these major systems so that the building can be reviewed appropriately for its investment potential.





     


847.332.1400 fax. 847.332.1430 1021 Wesley Avenue, Evanston, IL 60202 kurt@chicagohomeprimer.com